Roadmap to a qualified research preview
Product-transition exits PT0-PT8 and the minimum dataset-embodiment lane (FM-DSE, DSE6 qualified) are landed, and review findings RF-037 through RF-043 are verified complete. Full Moneta is implementation-partial: the direct critique-to-alternative loop, lineage capture and headless projections are landed, and investigator-visible qualification plus physical-device evidence remain open. Feature count does not substitute for evidence that the full investigation works safely on its target hardware.
Next implementation order
- Decide FM8 evidence binding. Accept or amend proposed RFC 0013 so each composed representation binds to semantically compatible governed evidence.
- Qualify investigator-visible surfaces. Exercise the FM1/FM2 perspective and alternative surfaces through the real product path, and measure FM5 advisory value.
- Qualify the device boundary. Run the instrumented interaction and endurance protocols on physical Meta Quest 3S hardware, including UXR4/UXR5 envelopes.
- Measure spatial performance. Attribute production cost from device benchmarks before selecting a query accelerator; remove redundant paths only on measured evidence.
Private preview gate
P1 can reopen only after blocker and high-severity audit findings have governed dispositions, the full CI gate remains green, and target-device evidence is reviewed. Learned ranking and future adaptive representation remain opt-in and must not bypass evidence policy.
Evidence vocabulary
- Built: a component and tests exist.
- Wired: production instantiates the component.
- Qualified: the declared environment and protocol pass.
- Validated: research evidence supports the intended human outcome.
Review the audit summary or read the live engineering roadmap on GitHub.